Roof installation.

Installation on the roof of the building. The pool water purification schedule has been adjusted to daylight hours, minimizing the energy cost of the community to a minimum.

Estimated Annual Production: 9 MWh/year

Installed power: 5.6 kW peak
Modules: 14
Amortization: 4.3 years
Tons of CO2 saved: 3